26 March 2019

Cleanse

Earlier this month, I planned an upcoming sobriety period for myself from cannabis. The plan is as follows:
3/17 - 4/20 : Discontinue cannabis, cigarettes acceptable (in moderation)
After 4/20 - Resume cannabis (maybe?), discontinue cigarettes

So far, I've been 9 days clean from both cannabis and cigarettes.

If you can't love your lungs, how the hell are you gonna love anything else?

24 March 2019

Mid-Life Mania

It's been an interesting couple weeks, as of late. Following my sudden termination from my CEATI role in Montreal, I was checked into the hospital for symptoms of weed-induced psychosis, after undergoing a manic attack resulting from my initial reaction to the termination.

This hospital has provided me a peaceful space with minimal distraction; it's led to a fountain of new inspirations and creative avenues for me, to apply towards the next stage of my career.


Thank you Lordt for making this happen - despite my initial frustrations at being here in the first place.

Now, if I could only get released from here this week, so I can get busy on cranking out some new music and some job applications...

16 March 2019

Fired

I was fired without notice on 13 March 2019 for instigating a "culture" incident by establishing a 360-degree performance review survey I had designed for my own annual review with my boss this Tuesday. Culture is at the heart of SAFETY, because we need folks to feel comfortable to "see something, say something, do something!" when hazards emerge, ESPECIALLY in the electric power industry.




If I smell something funny, I will say something, you're damned right. I'm a little proud of leaving, but massively disappointed overall that my employer didn't respect me enough to take my cue towards establishing and enforcing a Culture of Safety.


Doing the right thing ain't always easy...

12 March 2019

Concept & Case for Nationwide Electrified EHV/HSR Transport

This is a concept for a hybrid EHV/HSR (extra-high-voltage high-speed-rail) network, proposed to utility planners, executives, and the electric power industry generally. It proposes a framework for a mutually beneficial solution between the utility and advanced transportation industries to address yawning needs for infrastructure investment and development, in order to propel American society into the 21st Century through improved access to mobility and sustainable energy.


Background

There is a vast need throughout Canada and the developed world to not only maintain but modernize its aging infrastructure networks. Investment and maintenance of transport throughout most Western societies have suffered sustained decline over the past 40+ years, even before accounting for austerity measures imposed after 2008 that further curtail residual support for these systems.

Things weren’t always this way. As World War II ended, war veterans, families, and industries returned home to refocus economic activities towards growing domestic production again. During this era, the US federal government – in collaboration with automakers and oil producers, and championed by the President Dwight D. Eisenhower himself – aggressively pursued development of an expansive national interstate highway system, all while automobiles proliferated throughout the land. Mass-produced, affordable, and growing in popularity, automobiles were purchased by consumers of a growing “middle-class” that would fundamentally alter the infrastructure, landscape, and culture all around this “Greatest Generation.”

Meanwhile, as this growing web of interstate highways effectively cut straight into the hearts of major cities throughout the US, city populations were displaced over an ever-sprawling metropolitan area, and historic downtown city centers suffered dramatic population loss, leading to declining city revenues and chronic neglect. Faced with dwindling numbers of riders per square kilometer, transport operators suffered financial insolvency and were ultimately shut down, with minimal sustained support (or even direct opposition, in many cases) from federal and state governments that had, by then, solidified their alignment with automobile interests.

No longer able to compete in the car-centric realm that came to dominate this era, transport options over time continued to quietly dwindle throughout our cities, resulting in the dearth of urban and intercity transport options for riders and industries now faced today.


Breaking Out of the Status Quo

Meanwhile, there now exists an odd schism of environmental politics and power engineering principles that now confronts the electric power industry. As we continue the debate over how we ought to transform our “smart grid” into the “grid of the future,” a number of questions immediately comes to mind:
  • Will nuclear fuel be permitted for use in large-scale power production?
  • Will distributed generation destroy or enhance the need for EHV transmission?
  • Who should pay for batteries, harmonic filters, and other ancillary transmission facilities necessary to operate this “grid of the future”?
Betting on the grid continues to echo a complacent philosophy regarding the grid. The case for transmission has long been touted and speculated upon, and continues to drive large influxes of capital investment activities. Many utilities vulnerable from their generation business have looked to their transmission activities as a reliable “cash cow” to sustain their existing operations and growth strategies. With Enron (2001) slowly fading in the rear-view mirror, how similar is this collective sense of invulnerability that is now baked into our electric industry culture? Could other emerging threats, including emerging hijack and cybersecurity vulnerabilities, scare investors and customers away from this ongoing transmission binge?

As always, the fundamental question in our community is whether the assets comprising the modern power grid are being utilized (and compensated accordingly) to their fullest extent. Could transmission companies invest in transport, in order to hedge their bets against declines in customer load and grid utilization? Coupling the transport of power with people could revolutionize the world’s energy eco-system and accelerate our industry’s contributions to driving down greenhouse gas emissions on a broader scale worldwide.


The Design Concept

It is one goal of this proposal to assemble a cross-functional design team comprising a cross-section of electrical, electromagnetic, civil, mechanical, environmental, and safety/health experts. While technical details of this design have yet to be defined collaboratively, the overall design objective would be to marry the utilization of a common right-of-way for both high-speed rail (HSR) and EHV transmission, thus forming a robust “transport backbone” of a shared rail/power transmission system.


Naturally, the EHV system would power the high-speed train engines to propel passengers along the corridor. Electrostatic/-magnetic synergies could be achieved by utilizing stray electric field effects from the nearby EHV lines to “assist” with train propulsion; this would also mitigate stray/undesired electrostatic/-magnetic effects outside the ROW. Furthermore, the steel tracks for the rail line would provide an extremely solid ground source, dramatically improving voltage stability and reducing overvoltages from nearby switching or other system events.

With a dedicated freight rail line, bulky EHV transformers could be installed permanently on flatcars (similarly as road-based mobile transformer units), even while connected to the EHV system during normal (or standby) operation. This would provide a brand-new “analog” means for transmission operators to “slide” these assets dynamically along the corridors of the system to maximize their effectiveness at facilitating load allocation and voltage stability throughout this flexible “super-grid.”

This dynamic means of asset deployment would also eliminate supply chain/logistical “choke points” and greatly improve response time for stabilizing the system after large-scale system events, because manufacturing/shipping lead time for large power apparatuses could potentially be eliminated, with the provision of spare equipment that could be available on a standby basis at a nearby laydown/railyard facility.

Regular rail traffic among shared transmission line corridors could be leveraged indirectly as an ad-hoc means of network surveillance, as there are then many more “eyes on the ground” among commuters and utility maintenance personnel that could “see something, say something, do something!” in order to deter vandals and quickly alert authorities to imminent threats of hijacking and/or disruption.

Providing a dedicated maintenance/service line would enable safe and systematic ways for field personnel to access remote facilities for routine maintenance, reducing travel-related O&M expenses and risk from motor vehicle accidents while on the job. By reducing the need of motor vehicles to perform daily maintenance work, worker safety could vastly be improved, given the number of safety incidents that often occur in electric power companies from motor vehicle accidents.

Why the Electric Power Industry?

Our industry has the unique capability to deploy large amounts of capital decisively but also collaboratively with our community stakeholders. We could leverage its global community to assist in the technical design and development of this EHV/HSR concept, identify partners from the rail/transport industries with whom to develop this concept, establish the collaborative framework necessary to champion and sustain its execution, and help build the political support needed to make this concept a reality for our communities.


We cannot afford to continue faithfully waiting for dissonant and powerless governments around the world to act. While citizens and companies throughout Canada grow increasingly impatient for the federal government to execute (or even to propose) a bold vision to tackle these lingering greenhouse gas emissions, it is our responsibility as professional engineers in the electric power industry to take clear and decisive action on behalf of our communities, neighbors, and (grand-)children.

We could leverage the stability of our industry’s financial resources to provide sustained support and financing for executing large-scale projects on behalf of a vast array of stakeholders. A steady funding stream provides the baseline support and confidence necessary to competently drive projects, attract additional investors/partners, and ultimately sustain momentum and continuity with construction activity. When money runs out, the project halts. When the project halts, costs from delay rapidly accrue. Unfortunately, most past high-speed rail initiatives, thus far, have been paltry,
piecemeal, and uncoordinated – not to mention occasionally disrupted by firmly established adversaries entrenched with legacy auto/oil interests.

Our industry’s expertise with land/ROW acquisition would be extremely valuable to routing this future system. Working collaboratively with local communities and landowners – as we’ve always done – our industry could forge a robust alliance with local communities, inviting stakeholders to participate in this conversation to improve their regional economic activities, induce additional investment opportunities, and to keep an eye on the immediate construction impacts to their everyday lives, in order to minimize local opposition and NIMBY-ism and to ultimately respect these folks’ lands.

This concept defines a framework to forge an ambitious new “super-grid” that would not only continue serving our customers’ electric power transport needs reliably in a changing environment, but also to directly improve our customers’ everyday lives, by finally connecting people, places, and assets together with state-of-the-art transport on a unified electrified transport system.

All aboard the “Grid of the Future!”

10 March 2019

Trans-Americas music project

I'm beginning to scope out a new music project, to help tell parts of my story that have been tucked dormant. I have no timeline for this, but it starts now:


The playlist above comprises my "genesis playlist" which will creatively frame and inspire me in my own songwriting. Dane Terry was a big part of inspiring me to do this work, and his songs below provided particular inspiration for me in this creative journey.


I've been blessed with recent (and long-running) inspirations, threads, and people in life lately. It's time to build some magic from all this.




This will build upon the work I've developed 10+ years ago in my MIDI-based gaming tracks - https://soundcloud.com/buddha17.

This is where my heart and my brain stop being polite - and start getting real.

09 March 2019

NETIZENS


It's scary how easy it is these days for one's professional/creative identity to be hijacked from dark forces - vengeful exes, the Russian or Chinese government, who knows??? To everybody who uses the internet to promote their work and their passions - "CONSUMER BEWARE."

March - The Awakening

As we emerge from this cold yet peaceful winter, I figure it's time for a bit of an update on life.

Not real white/gray hair - yet...
I've now been working in Montreal as a Program Engineer for 1 year. One of the latest work-related "projects" I've had the opportunity to develop is our emerging Renewables Integration Conference, which will aid in the emergence of energy storage technology (e.g. batteries, dynamos) and software solutions for modern grid operations with increasing penetration of renewable energy sources (e.g. wind, solar).

I love the work I'm doing at this time, and it's been a fantastic way to nurture and cultivate a lot of my friends and professional contacts from yester-yore, throughout the industry and the stakeholder community in the energy/utility space. I'm trying subtly to steer how we can decisively deploy existing technologies and collaborative frameworks in the utility industry, in order to develop sustainable interconnected transport systems alongside a sustainable interconnected electric power system.

I'm preparing for a dizzying travel calendar in the coming year. If you're around any of these places and would like to re-connect, feel free to e-mail me at buddha17@gmail.com, and let's make some plans!

Blueprint for the future - High-Speed Rail (HSR) + Extra-High-Voltage (EHV) Electric Transmission
March 2019
21-24 : Tucson, AZ
29-31 : Columbus, OH

April 2019
7-10 : Los Angeles, CA
24-26 : Boca Raton, FL

May 2019
9-10 : White Plains, NY
11-12 : New York, NY
30-2 June : Columbus, OH

June 2019
24-28 : Santa Fe, NM

August 2019
20-23 : Raleigh, NC

October 2019
7-9 : Houston, TX
20-23 : Phoenix, AZ

November 2019
19-22 : Palm Springs, CA - Renewables Integration Conference